The builders arrived at 8.30 and they didn’t hang about stripping out the garage, utility and back room and built the wall to allow us to live in the house while the work goes on. There was a mad dash to empty the last of the cupboards, no work surface space left.
The dishwasher has been taken out of our kitchen and the washing machine plumbed in its space which means we don’t have to take our washing anywhere, yet!
The kitchen cupboards, tiles and flooring have gone from the back room. Just need to find somewhere to store the kitchen cupboards until we decide which ones we can use in the utility room.
The breakfast bar has been cut in half and an insulated stud wall put up, freezer has been moved into the kitchen so once we have reorganised we should be able to live as normal until they come through,
No going back now!! X